By
epm_dev
0
comment

04.01.2019

Works at Kryvorizhska substation 330 kV continue. Work is being carried out on the replacement of DC and AC boards, the reconstruction of the 330 kV outdoor switchgear, sections 223 and 227, with dismantling and subsequent installation of equipment, lighting and building structures.