Last news
October 2019
The beginning of work on laying cable and wire products for 6 kV complete switchgear at general unit reserve diesel station, power block No. 3 of the South Ukrainian NPP.
October 2019
Completion of installation of a 6 kV circuit breaker and the application of refractory materials at Khmelnitsky NPP.
September 2019
The beginning of work on the adaptation of the building- monument of architecture and urban planning "City Historical Archive", located at the address Universitetskaya St. 13 in Kharkov, under office premises with restoration of facades.
August 2019
Work has been completed at power unit No. 1 of the Khmelnitsky NPP to modernize relay protection and automation systems for 6kV auxiliary power systems.
August 2019
Start of work at Unit 5 of the Zaporizhzhya NPP to replace the excitation system of the TVB-1000 turbogenerator.
July 2019
Work has begun on power unit No. 3 of the South Ukrainian NPP to modernize control systems for standby diesel generators.
July 2019
Work has begun on power unit No. 3 of Rivne NPP to modernize VES-6 circuit breakers together with relay compartments.
29.05.2019
Completion of works on the object of Skazka shopping and entertainment center in the M. Gorky Park, Kharkiv
20.05.2019
Suspension of works on the Kryvorizhska substation 330 kV
15.05.2019
Completion of works on the installation and commissioning of power equipment with cable connections of section BB of unit No. 1 of the KNPP. Section BB is on duty.
09.05.2019
Completion of works on the installation and commissioning of power equipment with cable connections of the backup diesel power plant (BDPP) section 2 of module 1 of KNPP. BDPP is on dity.
04.01.2019
Works at Kryvorizhska substation 330 kV continue. Work is being carried out on the replacement of DC and AC boards, the reconstruction of the 330 kV outdoor switchgear, sections 223 and 227, with dismantling and subsequent installation of equipment, lighting and building structures.
31.12.2018
Work at the Zaporizhzhya NPP on technical re-equipment of Power Unit No. 3, the reactor compartment was completed, namely: “Replacement of equipment for automatic alarm of fire extinguishing system – 3 SB.”
31.12.2018
Work at the Zmiivska TPP on technical re-equipment of supply systems for the preparation and combustion of A and P grades with the conversion of the boiler units of station blocks 1 and 6 to the use of G and DG grade coal was completed.
18.12.2018
Work has begun on the Khmelnytska NPP on technical re-equipment of excitation systems of the generator of power unit No. 1.