Projects

Projects

1

2018

Rivne NPP, power-generating unit No. 3.

«Modernization of 0,4kV electrical switchgear» (PSS) at the power-generating unit No. 3.
“Modernization of the control system for backup diesel generators” at the power-generating unit No. 3.
“Modernization of the emergency power supply system of the first reliability group (including replacement of uninterruptible power supply devices, DC boards, batteries and more)” at the power-generating unit No. 3.
“Modernization of switches at WPP-6 together with relay compartments” (PSS) at the power-generating unit No. 3.
«Technical re-equipment. Generator excitation system of the Power-generating unit No. 1. Construction and installation work. Commissioning works»
Customer: НАЭК Атомэнерго (ЗАО «Техэнерго»)
Year of commissioning: 2018.
Type of work: assembly and commissioning.
Construction and assembly:
— installation of equipment 0,4 — 6 kV;
— installation of 6 kV and 0,4 kV cable lines;
— installation PVD equipment and secondary switching;
— installation of a conductor;
— installation of impulse lines.
Commissioning:
— high-voltage testing of 6 kV equipment (power transformers, switches and voltage transformers);
— testing of 6 kV and 0.4 kV cable lines;
— adjustment of PVD equipment;
— testing of 0.4 kV low-voltage switchgear devices;

2

«Reconstruction of a 330 kV open distribution device at the 330 kV substation «Kryvorizka», Dnipropetrovsk region

Customer: Ukrenergo NPC (CHESM LLC)
Year of commissioning: 2018 in progress;
Type of work: construction, assembly.
— installation of foundations and metal structures for equipment;
— installation of control and power cables 0,4kV;
— installation of boards of direct and alternating current;
— installation of 330 kV equipment (Switches, disconnectors, current transformers and voltage transformers);
— installation of 0,4 kV equipment (boards, panels and cabinets).

3

Zmiivska TPP Power block 6

“Technical re-equipment of the supply systems and preparation and disposal of the brand“ “A” and “P” with transforming of boiler units station No. 1, 6 Zmiivska thermal power plants PJSC «Centrenergo» for using coal of brand «G» and «DG», the 2nd turn.
Customer: Centrenergo PJSC (Kotloturboprom LLC)
Year of commissioning: 2018.
Type of work: construction, assembly.
Construction and assembly:
— installation of 0,4 kV equipment (boards, panels and cabinets).
— installation of 6 kV equipment;
— installation of control and power cables 6 kV and 0,4kV;
— installation of lighting network and lighting fixtures.
Commissioning:
— comprehensive testing of 6 kV cells;
— testing of 6 kV and 0.4 kV cable lines;
— testing of current transformers.

4

«Services in repair and maintenance of equipment (Services in repair and maintenance of systems of relay protection, automation and telemechanics switchgear 10 kV. Сondensate stabilization technology workshop №1, 2)

Customer: JSC UkrGasVydobuvannya
Year of commissioning: 2018.
Type of work: commissioning.
Commissioning:
— inspection of devices, secondary circuits and wiring up to 1000 V;
— inspection of contacts of connecting wires, prefabricated and connecting tires;
— inspection of oil and vacuum switches;
— testing of measuring transformers (current and voltage);
— adjustment of relay protection, automation and remote control system.

5

«Repair and testing works on 10 kV closed switchgear and transformer substations at the address: Kharkiv region, Velikoburlutskiy district, urban-type settlement. Prikolotne urban-type settlement»

Customer: Przkolotne oil-extracting factory LLC
Year of commissioning: 2018.
Type of work: commissioning.
Commissioning:
— testing of cable lines 0,4 — 10 kV;
— testing of 0.4 kV equipment;
— high voltage testing of 10 kV equipment.

6

Zaporizhia NPP, power-generating unit No. 4

«Technical re-equipment. Zaporizhzhya nuclear power plant, Energodar, Promyslova Str. 133 Power-generating unit No. 4 Reactor compartment. Automatic fire alarm equipment replacement (installation of fire alarm equipment in accordance with special requirements) 2СБ, 3СБ. Construction and installation works»
Customer: State Enterprise «National Atomic Energy Generating Company» Energoatom», Zaporizhzhya nuclear power plant.
Year of commissioning: 2018.
Type of work: construction, assembly.
— installation of 0,4 kV equipment (boards, panels and cabinets).
— installation of control and power cables 0,4kV;
— installation of automatic fire alarm sensors.

6

«Services in repair and maintenance of systems of relay protection, automatics and telemechanics of transformer substations no.1, 2, 3, 4, 5, 6, 7 Shebelinка branch of gas condensate and oil processing»

Customer: JSC UkrGasVydobuvannya
Year of commissioning: 2018.
Type of work: commissioning.
— inspection of devices, secondary circuits and wiring up to 1000 V;
— inspection of contacts of connecting wires, prefabricated and connecting tires;
— inspection of oil and vacuum switches;
— testing of measuring transformers (current and voltage);
— adjustment of relay protection, automation and remote control system.

7

2017

«Arrangement of the Yablunivsky oil and gas condensate field. Technical re-equipment of unified oil processing unit Yablunivka»

Customer: JSC UkrGasVydobuvannya, Gas Industrial Company PoltavaGasVydobuvannya
Year of commissioning: 2017.
Type of work: commissioning.
— inspection of devices, secondary circuits and wiring up to 1000 V;
— inspection of contacts of connecting wires, prefabricated and connecting tires;
— inspection of oil and vacuum switches;
— testing of measuring transformers (current and voltage);
— adjustment of relay protection, automation and remote control system.

9

Pridnestrovska thermal power plants

«Technical re-equipment of power units №7, 8th DTEK of the Dnieper TPP for conversion of TP-90 boilers to use gas group coals»
Customer: DTEK DNEPROENERGO PJSC (ELKOR OPEC)
Year of commissioning: 2017.
Type of work: construction, assembly and commissioning.
Construction and assembly:
— installation of 0,4 kV equipment (boards, panels and cabinets).
— installation of control and power cables 0,4kV;
— installation of lighting network and lighting fixtures.
Commissioning:
— testing of 0,4 kV cable lines;
— testing of 0.4 kV equipment;
— inspection of control cabinets of various mechanisms;
— adjustment of actuators of shut-off valves.

10

Zmiivska TPP Power block 2.

“Technical re-equipment of the supply systems and preparation and disposal of the brand“ “A” and “P” with transforming of boiler units station No. 2, 5 Zmiivska thermal power plants PJSC «Centrenergo» for using coal of brand «G» and «DG», the 2nd turn.
Customer: Centrenergo PJSC (ELKOR OPEC)
Year of commissioning: 2018.
Type of work: construction, assembly and commissioning.
Construction and assembly:
— installation of 0,4 kV equipment (boards, panels and cabinets).
— installation of 6 kV equipment;
— installation of control and power cables 6 kV and 0,4kV;
— installation of lighting network and lighting fixtures.
Commissioning:
— testing of 6 kV and 0.4 kV cable lines;
— testing of 0.4 kV equipment;
— cabinets (diagonal ploughs and belt conveyors, soot blowing system)
— Adjustment works of central control panel (conveyor)
— comprehensive testing of 6 kV cells.

4

«Services in repair, maintenance, adjustment of high-voltage equipment, relay protection and automatics at substations»

Customer: JSC UkrGasVydobuvannya, Gas Industrial Company PoltavaGasVydobuvannya
Year of commissioning: 2017.
Type of work: commissioning.
— inspection of devices, secondary circuits and wiring up to 1000 V;
— inspection of contacts of connecting wires, prefabricated and connecting tires;
— inspection of oil and vacuum switches;
— testing of measuring transformers (current and voltage);
— adjustment of relay protection, automation and remote control system.

12

South Ukraine Nuclear Power Plant, power-generating unit No. 2

“Works on reconstruction of 6-kV complete switchgear (general unit sections ВА, ВВ, ВС, BD) at power block No. 2”
2nd stage
Customer: NNEGC Atomenergo (South Ukraine Nuclear Power Plant)
Year of commissioning: 2017.
Type of work: construction, assembly.
— installation of 0,4 kV equipment (boards, panels and cabinets).
— installation of 6 kV equipment;
— installation of control and power cables 6 kV and 0,4kV.

13

2016

South-Ukrainian nuclear power plants

«Reconstruction of cable ducts to comply with the requirements of the operational documentation»
“Dismantling works on reconstruction of 6-kV complete switchgear sections (general unit sections ВА, ВВ, ВС, ВD)” 1st stage
Customer: NNEGC Atomenergo (South Ukraine Nuclear Power Plant)
Year of commissioning: 2016.
Type of work: construction, assembly.
— installation of 0,4 kV equipment (boards, panels and cabinets).
— installation of 6 kV equipment;
— installation of control and power cables 6 kV and 0,4kV.

4

«Services in repair, maintenance, adjustment of high-voltage equipment, relay protection and automatics at substations»

Customer: JSC UkrGasVydobuvannya, Gas Industrial Company PoltavaGasVydobuvannya
Year of commissioning: 2016.
Type of work: commissioning.
— inspection of devices, secondary circuits and wiring up to 1000 V;
— inspection of contacts of connecting wires, prefabricated and connecting tires;
— inspection of oil and vacuum switches;
— testing of measuring transformers (current and voltage);
— adjustment of relay protection, automation and remote control system.

15

Shopping and recreation center KAZKA Kharkiv

Construction of the object of stationary recreation (catering enterprise) on Sumska street 81 in Kharkiv city.
Customer: SK BILKOS LLC
Year of commissioning: 2016-2018.
Type of work: construction, assembly and commissioning.
Construction and assembly:
— installation of a network of general and decorative lighting and lighting devices
— installation of power equipment 0.4 kV
— installation of cable networks 0.4 kV.
Commissioning:
— testing of 0,4 kV cable lines;
— testing of 0.4 kV equipment;
— inspection of devices, secondary circuits and wiring up to 1000 V.

16

2015

«Commissioning works on aggregate panel of control station at gas pumping units №5, 6 CS» Reshetilovska»

Customer: NIK LLC
Year of commissioning: 2015г.
Type of work: commissioning.
— adjustment of relay protection, automation and remote control system.
— inspection of devices, secondary circuits and wiring up to 1000 V;
— testing of measuring transformers (current and voltage).

17

«Repair and testing of 10 kV cable lines at: Kharkiv region, Velikoburlutskiy district, Prikolotne urban-type settlement»

Customer: Prikolotne oil-extracting factory LLC
Year of commissioning: 2015.
Type of work: commissioning.
— testing of cable lines 0,4 — 10 kV;
— testing of 0.4 kV equipment;
— high voltage testing of 10 kV equipment.

18

South Ukraine Nuclear Power Plant, power-generating unit No. 2

“Dismantling works on reconstruction of 6-kV complete switchgear sections (general unit sections ВА, ВВ, ВС, ВD)”
“Works on reconstruction of 6-kV complete switchgear (general unit sections ВА, ВВ, ВС, BD) at power block No. 2” 1st stage
Customer: NNEGC Atomenergo (South Ukraine Nuclear Power Plant)
Year of commissioning: 2015.
Type of work: construction, assembly.
— installation of 0,4 kV equipment (boards, panels and cabinets).
— installation of 6 kV equipment;
— installation of control and power cables 6 kV and 0,4kV.

7

«Services in repair, maintenance, adjustment of high-voltage equipment, relay protection and automatics at substations»

Customer:JSC UkrGasVydobuvannya, Gas Industrial Company PoltavaGasVydobuvannya
Year of commissioning: 2015.
Type of work: commissioning.
— inspection of devices, secondary circuits and wiring up to 1000 V;
— inspection of contacts of connecting wires, prefabricated and connecting tires;
— inspection of oil and vacuum switches;
— testing of measuring transformers (current and voltage);
— adjustment of relay protection, automation and remote control system.

20

«Substation 330кV Mirgorod. Replacement of the switch in room No. 11 of the 110 kV power line, Timofeyevka. Сonstruction and installation and commissioning works”

Customer:JSC UkrGasVydobuvannya, Gas Industrial Company PoltavaGasVydobuvannya
Year of commissioning: 2015.
Type of work: construction, assembly and commissioning.
Construction and assembly:
— installation of foundations and metal structures for equipment;
— installation of control and power cables 0,4kV;
— installation of 110 kV equipment (Switches, disconnectors, current transformers and voltage transformers);
— installation of 0,4 kV equipment (boards, panels and cabinets).
Commissioning:
— testing of cable lines 0,4 — 10 kV;
— testing of 0.4 kV equipment;
— high voltage testing of 10 kV equipment.

21

«Construction and installation work on completion of construction of hydroelectric units No.2 and No.3 of the Dniester Pumped Storage Power Station» (hydroelectric unit No.3)

Customer: Consortium «research and production association «Ukrgidroenergobud «
Year of commissioning: 2015-2016
Type of work: construction, assembly.
— installation of supporting metal structures for the current line TENE (generator voltage conductors)-SESHCH (Samara electric board) -20 and TZK (closed сonductors with voltage)-SESHCH)-6;
— installation of conductors of TENE (generator voltage conductors)-SESHCH (Samara electric board)-20;
— installation of conductors of TZK (closed сonductors with voltage)-SESHCH-6.

22

Restaurant NIKAS, Kharkiv

«Reconstruction of the restaurant with a summer area in Universitetska str., 2 in Kharkiv»
Customer: SK BILKOS LLC
Year of commissioning: 2016-2017.
Type of work: construction, assembly and commissioning.
Construction and assembly:
— installation of general and decorative lighting network and lighting fixtures
— installation of power equipment 0,4 kV;
— installation of 0,4 kV cable networks.
Commissioning:
— testing of 0,4 kV cable lines;
— testing of 0.4 kV equipment.

23

2014

«Overhaul — replacement of disconnect actuators for 110 kV open switchgear and cables in 330 kV circuits Artema substation

Customer: State enterprise National energy company «Ukrenergo»
Year of commissioning: 2014.
Type of work: construction, assembly .
— installation of disconnector drives 110 kV;
— installation of control and power cables 0,4kV.

5

«Repair, installation and testing of 10 kV indoor switchgear, transformer substations, cable lines and measuring works»

Customer: Prikolotnyansky oil-extracting factory LLC
Year of commissioning: 2014.
Type of work: commissioning.
— testing of cable lines 0,4 — 10 kV;
— testing of 0.4 kV equipment;
— high voltage testing of 10 kV equipment.

7

«Services on adjustment of high-voltage equipment, relay protection and automatics at substations»

Customer: JSC UkrGasVydobuvannya, Gas Industrial Company PoltavaGasVydobuvannya
Year of commissioning: 2014.
Type of work: commissioning.
— inspection of devices, secondary circuits and wiring up to 1000 V;
— inspection of contacts of connecting wires, prefabricated and connecting tires;
— inspection of oil and vacuum switches;
— testing of measuring transformers (current and voltage);
— adjustment of relay protection, automation and remote control system.

17

2013

«Repair, installation and testing of 10 kV indoor switchgear, transformer substations, cable lines and measuring works»

Customer: Prikolotnyansky oil-extracting factory LLC
Year of commissioning: 2013.
Type of work: commissioning.
— testing of cable lines 0,4 — 10 kV;
— testing of 0.4 kV equipment;
— high voltage testing of 10 kV equipment.

12

South Ukraine Nuclear Power Plant, power-generating unit No. 1

«Works on reconstruction of 6-kV complete switchgear (general unit sections ВА, ВВ, ВС, BD) at power block No. 1»
Customer: NNEGC Atomenergo (South Ukraine Nuclear Power Plant)
Year of commissioning: 2013-2014.
Type of work: construction, assembly.
— installation of 0,4 kV equipment (boards, panels and cabinets).
— installation of 6 kV equipment;
— installation of control and power cables 6 kV and 0,4kV.

ten-1

«Construction and installation work on completion of construction of hydroelectric units No.2 and No.3 of the Dniester Pumped Storage Power Station» (hydroelectric unit No.2)

Customer: Consortium «research and production association «Ukrgidroenergobud «
Year of commissioning: 2013-2014.
Type of work: construction, assembly.